What Does RL m AHD Mean in a Geotechnical Report?
RL means Reduced Level, AHD means Australian Height Datum. Two worked examples, a platform in cut and a platform in fill, showing what a des...
Geotechnical engineering resources covering soil mechanics, foundations, and site investigation.
RL means Reduced Level, AHD means Australian Height Datum. Two worked examples, a platform in cut and a platform in fill, showing what a des...
How to read an Australian borehole log: the header, main columns, soil and rock description structure, weathering grades, consistency terms,...
How the borehole, sampling and laboratory testing program behind an AS 2870 site classification is scoped, carried out and converted into a...
A practical guide to planning, observing and recording proof rolling of earthworks and subgrade surfaces.
A practical guide to representative soil sampling, sample types, handling, identification and chain of custody.
A review workflow for applying and documenting an engineer-approved geotechnical strength reduction factor for pile resistance.
A structured pile assessment workflow covering demand, resistance, serviceability, group effects and verification.
A structured settlement assessment combining movement components, locations, differential settlement and time effects.
A standards-controlled workflow for residential site classification under AS 2870, designed for engineering review.
Calculate vertical stress increase beneath a surface point load using the Boussinesq elastic half-space solution.
A cautious, configurable workflow for using DCP-derived correlations in preliminary pile assessment.
A review workflow for soil description and classification aligned with AS 1726, without reproducing controlled standard tables.